Industrial maintenance management and control system for high volume bearing production lines

Authors

DOI:

https://doi.org/10.61117/ipsumtec.v7i2.334

Keywords:

Centralized maintenance, maintenance management, preventive maintenance, total productive maintenance (TPM), work orders

Abstract

The project focuses on centralizing maintenance in the High Volume Bearings (H.V.B.) and Metallurgy areas, applying Total Productive Maintenance (TPM). The initial diagnosis revealed deficiencies in maintenance planning, the absence of a centralized system, and a high dependency on production, leading to frequent failures and prolonged response times.

A digital system was proposed for maintenance management, improving the organization of preventive maintenance schedules, work order requests, and critical spare parts inventory control. The methodology included the creation of standard operating procedures (SOP) for supervisors and technicians, as well as the use of thermographic cameras for predictive maintenance.

The results were significant. Response time was reduced from 9.5 to 3 minutes, and preventive maintenance compliance increased from 30% to 85%. Additionally, 100% of work orders were completed, enhancing operational efficiency. The system enabled effective centralization, facilitating the analysis of key indicators like MTBF and MTTR, optimizing real-time decision-making.

In conclusion, the project significantly improved maintenance management, promoting efficiency and reducing downtime. It is recommended to keep the computer equipment active and monitor the inventoryand work orders to ensure the correct operation of the implemented system.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

References

González, F. J. (2018). Teoría y práctica del mantenimiento industrial avanzado (1ª edición). Madrid: Fundación Confemetal.

Tenneco Inc. (2022). “Overview of Tenneco: History and Acquisitions”.

Crespo Márquez, A. (2017). Ingeniería de mantenimiento. Técnicas y métodos de aplicación a la fase operativa de los equipos (1ª edición). Madrid: AENOR.care

Dounce Villanueva, E. (2018). Administración de Mantenimiento.

García Garrido, S. (2019). Organización y gestión integral de mantenimiento (2ª edición). Madrid: Díaz de Santos.

López, M. (2020). Mantenimiento Preventivo: Estrategias y Prácticas Efectivas (1ª edición). México: Ed. Universitaria.

Alfonso, A. (2018). Elementos de mantenimiento (1ª edición). Ciudad de México: CENAPRO.

Olarte, W., Botero, M., & Cañon, B. (2010). Importancia del mantenimiento industrial dentro de los procesos de producción. Scientia et technica, 16(44), 354-356. Disponible en: https://www.redalyc.org/

Sosa, J. V. G., Quijada, J. L., Ontiveros, M. Á. L., Montoya, P. P., & Hernández, A. C. (2018). Mantenimiento industrial en máquinas herramientas por medio de AMFE. Revista Ingeniería Industrial, 17(3). DOI: https://doi.org/10.22320/S07179103/2018.12

Disponible en: https://core.ac.uk/

Yavarone, R. (2019). La importancia del diagnóstico eficiente en el mantenimiento industrial. AADECA Revista. Disponible en: https://editores-srl.com.ar/sites/default/files/aa11_yavarone_diagnostico_eficiente.pdf

Newbrough, E. T. (2016). Administración del Mantenimiento Industrial (1ª edición). México: DIANA.

Higgins, L. R. (2017). Maintenance Engineering Handbook (8ª edición). Nueva York, EE. UU.: McGraw Hill.

Piotrowski, J. (2019). Shaft Alignment Handbook (3ª edición). Nueva York, EE. UU.: CRS Press.

U.S. Department of Labor. (2021). “Industrial Maintenance and Repair: Best Practices”.

Silva, R. (2021). “Implementación de TPM en empresas manufactureras: Un estudio de caso”. Revista de Mantenimiento y Gestión, 12(2), 100-112.

Cárdenas, J. (2021). “Mantenimiento productivo total: Metodologías y beneficios”. En Actas del Congreso Internacional de Ingeniería, pp. 23-30. Ciudad de México: Universidad Nacional Autónoma de México.

CEGID (2024) “Software de gestión de mantenimiento industrial, España. Disponible en: https://www.cegid.com/

EMAINT (2024) “Equipos de recolección de datos industriales”, Estados Unidos de América. Disponible en: https://www.emaint.com/

ips

Published

2024-12-18

Crossmark

Crossmark Policy Page

How to Cite

Martínez Rabanales, S., Hernández Martínez, A., Sosa Pintle, A. M., García Sierra, M. R., & Martínez Ramírez, V. (2024). Industrial maintenance management and control system for high volume bearing production lines. REVISTA IPSUMTEC, 7(2), 258–263. https://doi.org/10.61117/ipsumtec.v7i2.334

Issue

Section

Artículos

Most read articles by the same author(s)

1 2 3 4 > >>