Characterization of the server repair process in a manufacturing plant
DOI:
https://doi.org/10.61117/ipsumtec.v6i7.252Keywords:
Characterization, DMAIC, DPPM, false failure, methodology, improvement, NFF, PCBAbstract
This research presents the characterization of the repair process followed for the server PCB component by the production department, the results of the determination of a false failure and its impact on the DPPM metric in its NFF categorization. After the use of the DMAIC methodology, value flow maps and the characterization of variables, it was possible to identify physical differences between the test methods executed by the different departments involved in order to obtain a false failure result at the end of the process. It is inferred in the results of the DPPM measurable and its NFF categorization after performing the actions of the DMAIC methodology reviewed in the research. In determining the sample size, the two-year history was taken into account as a decisive factor. An action plan was developed for each difference situation, new control documents were added to existing processes, and measurement tools and test methods were standardized across all departments to reduce the possibility of variation in the final results of false failure determination. These changes generate benefits such as improved information recording, improved repair process, increased repair assertiveness effectiveness, improved repair times, improved DPPM metrics in the NFF portion, minimized storage costs and reduced waiting times in a return and repeat environment.
Downloads
Metrics
References
Sarabia A. (1995), LA TEORÍA GENERAL DE SISTEMAS.
Alonso Tamayo Alzate (1999), TEORÍA GENERAL DE SISTEMAS.
Lorenzon, E. E. (2020) Sistemas y organizaciones. DOI: https://doi.org/10.35537/10915/99629
T. Ohno, El sistema de producción Toyota: más allá de la producción a gran escala. Barcelona: Gestión 2000, 1991.
Recuperado de: https://www.cemiot.com/inicio/las-9-eses-organizacion-orden-y-limpieza-en-la-empresa/.
Paredes-Rodríguez, A. M. (2017). Aplicación de la herramienta Value Stream Mapping a una empresa embaladora de productos de vidrio.
Nash, Mark y Poling Sheila. (2008) Mapping the Total Value Stream.
Lopez, G. (2001). Metodologia six-sigma: Calidad Industrial. Baja California, Mexico.
Baldemar, J., & Abrego, R. (2015). Reducción y control de costos en empresa de manufactura con seis sigma. Mexico.
Jeroen de Mast, Joran Lokkerbol (2012). An analysis of the Six Sigma DMAIC method from the perspective of problem solving. DOI: https://doi.org/10.1016/j.ijpe.2012.05.035
Egas A., D. A. (2017). Proyecto de Disminución de Desperdicios en el Proceso Productivo de las Máquinas Generadoras en la Planta Proquinal S.A. Colombia, Utilizando la Metodología DMAIC.
Haiyu Qi *, Sanka Ganesan 1, Michael Pecht (2008). No-fault-found and intermittent failures in electronic products.
P. So¨derholm / Reliability Engineering and System Safety 92 (2007) 1–14 DOI: https://doi.org/10.1016/j.ress.2005.11.004
Hernández Sampieri, R., Fernández Collado, C., & Baptista Lucio, P. (2014). Metodología de la investigación (6a. ed. --.). México D.F.: McGraw-Hill.
Recuperado de: https://www.westgard.com/mltirule.htm.
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Roberto Israel Aguirre Aguayo, Lizette Alvarado Tarango, Francisco Zorrilla Briones, Manuel Arnoldo Rodriguez Medina, Luz Elena Terrazas Mata

This work is licensed under a Creative Commons Attribution 4.0 International License.
